(604) 513-0316 [email protected]
South Fraser Perimeter Road, Surrey & Delta B.C

South Fraser Perimeter Road, Surrey & Delta B.C

North Shore Trade Area; Lower Level Road, North Vancouver B.C. The SFPR is a 40 km long four-lane route along the south side of the Fraser River, extending from Deltaport Way in Southwest Delta to 176th Street, including connections to Highway 1, 15, 17, 91, 99 and to...
South Fraser Perimeter Road, Surrey & Delta B.C

North Shore Trade Area; Lower Level Road, North Vancouver

North Shore Trade Area; Lower Level Road, North Vancouver B.C. Designed to address growing community safety & traffic congestion concerns around the North Shore Trade Area Date: 2015 Client: B & B Heavy Civil Construction Ltd. Cost of Project: Estimated $106...
South Fraser Perimeter Road, Surrey & Delta B.C

East Langley Water Supply; Phase 3

East Langley Water Supply; Phase 3 The final phase of the East Langley Water Supply project along 52 Avenue (between 224 Street and 249 B Street, and north to 56 Avenue). Client: Westpro Infrastructure Ltd. Cost of Project: Estimated $8 million Providing all Soils...
South Fraser Perimeter Road, Surrey & Delta B.C

Fairview Container Terminal – Prince Rupert

Fairview Container Terminal Fairview Container Terminal is a dedicated intermodal facility, purpose-built to provide a high-velocity gateway for transpacific container trade in Prince Rupert. Date: 2017 Client: FRPD-BEL Gateway JV Project Type: Civil Fastest and most...
South Fraser Perimeter Road, Surrey & Delta B.C

Surrey Biofuel Facility

Surrey Biofuel Facility The Surrey Biofuel Facility is a smart, sustainable solution for Surrey’s organic waste. Date: 2016 Client: TAG Construction Ltd. Project Type: industrial Creating a fully integrated model for organic waste management Built as part of the...